Proposed TIP Amendment

January Proposed Amendment #6

TIP Roadway Projects

PID County Facility Location Description Project_Type Award Date Total_Cost
6-3215 Boone Burlington Multi-Use Path Along KY18 to KY237 then to Limaburg Rd 5450' of new 10' multi-use path bicycle/pedestrian/other FY18 $1,281,319
6-442 Boone Camp Ernst Road Intersection with Longbranch Road Add a dedicated left turn lane on SB Camp Ernst Road to Longbranch Road traffic operations/safety FY19 $1,269,439
6-9013 Boone Intersection Improvements Various locations in Boone and Kenton counties Safety project for intersection improvements (toll credits) traffic operations/safety FY18 $620,000
6-8000.20 Boone IR 275 I-275/KY 212 Interchange and KY 20 reconstruction MP 4.842 to 4.942--Near Cincinnati/Northern KY International Airport (toll credits) widening/relocation UNSC $25,310,000
6-8953 Boone IR 275 IR 275 and Graves Road Interchange justification study studies FY17 $1,225,000
NP Boone IR 71 IR SB Weigh Station Update the overheight equipment (toll credits) maintenance/reconstruction FY16 $14,500
6-1096 Boone IR 71 Interchange with IR 75 (Toll credits as match) Bridge repairs on IR 71 NB and SB twin bridges over IR 75 (Amendment #8, 5-12-16) maintenance/reconstruction 7/6/2016 $900,000
6-14.50 Boone IR 75 From KY 536 to US 42. Add auxiliary lane on IR 71/75 (toll credits) widening/relocation FY20 $28,400,000
6-18.00 Boone IR 75/KY 338 Interchange KY 338 (Richwood Road) Interchange MP 175.217 to 175.622--Reconstruct KY 388 (Richwood Rd) Interchange (toll credits) widening/relocation FY21 $103,500,000
6-18.10 Boone IR 75/KY 338 Interchange KY 338 (Richwood Road) Interchange Additional funding for 6-18.00 to reconstruct KY 338 interchange (toll credits) traffic operations/safety FY21 $15,000,000
6-18.11 Boone IR 75/KY 338 Interchange KY 338 (Richwood Road) Interchange Additional funding for 6-18.00 to reconstruct KY 338 interchange (toll credits) traffic operations/safety FY22 $27,000,000
6-14.00 Boone IR 75/KY 536 Interchange IR 71/75 at KY 536 (Mt. Zion Rd) See 14.02 for add't funding MP 177.659 to 178.345--Reconstruct KY 536 (Mt. Zion Rd) Interchange (toll credits) traffic operations/safety FY19 $48,485,000
6-8001.21 Boone KY 237 Valley View to Rogers Lane--Toll credits Reconstruct and widen KY 237 from Valley View Drive to Rogers Lane, MP 2.25 to 5.37 widening/relocation FY18 $24,660,000
6-415 Boone KY 237 KY 237 and Worldwide/KY 2846 Additonal turn lanes at KY 237/Worldwide & lane extension through the KY 237/KY 2846 intersection maintenance/reconstruction FY17 $4,200,000
6-8001.22 Boone KY 237 Valley View to Rogers Lane--Toll credits Additional funding to reconstruct and widen KY 237 from Valley View Drive to Rogers Lane widening/relocation FY18 $9,000,000
6-415.10 Boone KY 237 KY 237 and Worldwide/KY 2846 Provide additional left turn lane from KY 237 NB to Worldwide Blvd maintenance/reconstruction FY17 $750,000
6-440 Boone KY 237 Multi-modal path Stephens Elementary School north to KY 20/Petersburg Road Construct a multi-modal path bicycle/pedestrian/other FY18 $2,594,950
6-423 Boone KY 3060 (Frogtown Rd) 900' either direction of intersection with Triple Crown Correct vertical and horizontal curves. Toll credits for DES phase traffic operations/safety FY18 $2,150,000
6-3200 Boone KY 3060 (Frogtown Rd) Sidewalks Northside of Frogtown Road from US 42 to War Admiral Drive Construct new sidewalks bicycle/pedestrian/other FY18 $373,452
6-8952 Boone KY 338 Intersection of Idlewild/Jefferson (KY 338) and Temperate Streets to Boone County Fairgrounds Reconstruct intersection and add sidewalks (Same as 6-3019.1 in STIP) maintenance/reconstruction FY17 $585,000
6-158.01 Boone KY 536 From 1500' west of US 42 to I-75 (Administrative Modification #10, 9-6-16) Widen to 5 lanes from 1500' west of US 42 to IR 75, MP 10.40 to 13.40. Toll credits widening/relocation 11/4/2016 $26,129,338
6-433 Boone KY 717 (Turfway Road) At the 90 degree bend near the Cincinnati/Northern KY International Airport Improve the safety at the 90 degree curve (toll credits as match) traffic operations/safety FY18 $2,900,000
6-1087 Boone KY 842 Bridge over the NS RR on Richardson Rd. (KY 842), 0.14 miles east of US 25 near Independence Bridge Replacement) toll credits bridge/culvert replacement UNSC $6,000,000
6-3707 Boone Limaburg Road Intersection of KY 18 Extend the dedicated left turn lane, the straight/left turn lane and the dedicated right turn lane. traffic operations/safety $45,760
NP2 Boone Litton Lane Sidewalks North side of Litton Lane Install sidewalks bicycle/pedestrian/other FY18 $194,366
6-422 Boone Longbranch Road Longbranch Rd & Camp Ernst Rd Reconstruct intersection, add left turn lane on Longbranch to SB Camp Ernst ($1,250 tc for design) traffic operations/safety FY17 $945,300
6-439 Boone Ted Bushelman Boulevard Along Ted Bushelman Boulevard Add center, 2-way left turn lane traffic operations/safety FY18 $1,452,500
6-351.45 Boone US 25 at Mubea entrance (toll credits) Construct a southbound left turn lane at Mubea, north of KY 842 traffic operations/safety $2,690,000
6-367 Boone US 42 Intersection of US 42 & KY 842 Construct turn lanes at intersection (toll credits) traffic operations/safety FY17 $6,515,000
6-412 Boone US 42 US 42 at Rice Pike/Hicks Pike US 42-MP 8.4 to 8.6 Intersection improvement (toll credits) traffic operations/safety 11/3/2017 $4,400,000
6-700 Boone Veterans Way Existing Veterans Way between KY 18 and KY 237 2-lane extension of existing Veterans Way between KY 18 and KY 237 widening/relocation FY17 $2,896,877
NP4 Boone Walton Pedestrian Bridge Walton Install a pedestrian bridge/multi-modal pathway connecting two sections of High Street bicycle/pedestrian/other FY18 $285,000
NP5 Boone Weaver Road Sidewalks From Tamarack Drive to Saddlebrook Install sidewalks along 2,100' along north and east side of Weaver Road bicycle/pedestrian/other FY18 $422,400
6-417 Boone Wendell Ford Blvd From end of current Wendell Ford Blvd to Aero Parkway--0.48 miles Extension of Wendell Ford Blvd. near CVG Airport (Admin. Mod. #1, 9-8-15; Admin Mod #12, 11-8-16) widening/relocation FY17 $3,972,120
98789 Butler CR 113 (Liberty Fairfield) MP 1.00 to 1.98 Install two way left turn lane modification to the vertical profile south of Moselle Drive traffic operations/safety 4Q19 $4,063,820
106407 Butler CR 148 CR 148 at Wayne Madison and Hamilton Trenton Road install a multi-lane roundabout with pedestrian accomodations traffic operations/safety 1Q21 $2,171,426
98784 Butler CR 18 (Princeton Road) MP 2.55 to MP 4.35 Widen existing lane widths from 10' to 11' and adjust vertical profile traffic operations/safety 3Q18 $2,207,201
96452 Butler CR 19 (Cin-Day Road) West Chester Road to Station/LeSourdsville West Chester Road Widening from 2 lanes to 4 lanes widening/relocation 4Q18 $10,437,705
98776 Butler CR 19 (Cin-Day Road) Lesourdsville West Chester Rd/Station Rd intersection to IR 75 NB on-ramp (Admin Mod. 11, 10-11-16) Widening roadway to provide center turn lane and additional SB lane. Replace sidewalk, add new traffic operations/safety 3Q18 $500,000
98771 Butler Fairfield ITS Phase 2 Throughout the City of Fairfield Upgrades to existing central traffic system with advanced technology traffic operations/safety 4Q18 $3,103,133
100188 Butler Great Miami River Trail Extension Adjacent to SR 73 from current trail terminus near Briel Blvd. to Baxter Dr trailhead north of SR 73 Construction of 10' wide multi-use trail to extend existing Great Miami River Trail bicycle/pedestrian/other 3Q20 $683,500
99904 Butler Hamilton Pedestrian Bridges One on Glencross Avene over Two Mile Creek and one in Howard F. Wilson Park over Shaffer Creek Replace two pedestrian bridges bicycle/pedestrian/other 3/7/2017 $324,585
106129 Butler Hamilton-Mason Road - Five Points Five Points intersection at Hamilton-Mason, Tylersville, Grand, Hancock and Turley Improve the five road intersection by converting to a roundabout traffic operations/safety 2Q21 $2,457,500
103754 Butler IR 75 Exit ramps at IR 75 and Tylersville Road Improve capacity at exit ramps, add EB right turn lane on Tylersville at the SB ramps traffic operations/safety 4Q18 $1,111,113
105057 Butler Oxford Area Trail Connect corridor between SR 73 and over to US 27 south. Paved shared use path on the southeast side of Oxford. bicycle/pedestrian/other 3Q19 $1,200,000
98852 Butler Salzman Road Intersection of Todhunter to northern terminus of Salzman, approx. 2,750' Extension of Salzman Road widening/relocation 1/31/2017 $2,814,910
93593 Butler SR 129 SR 129 and SR 177/Eaton Avenue intersection in the City of Hamilton Realign the offset intersection traffic operations/safety 4Q18 $3,850,910
104195 Butler SR 129/Liberty Way SR 129/Liberty Way Interchange along I-75 Revamp existing interchange to extend SR 129 to Cox Rd and Liberty Way and reconfigure several ramps traffic operations/safety FY21 $33,444,343
102059 Butler SR 73 Intersection of SR 73 and Jacksonburg Intersection improvement traffic operations/safety 4Q19 $1,650,100
99558 Butler SR 747 Between Princeton and Millikin Roads Widen from 2 lanes to 5 lanes widening/relocation 6/5/2017 $8,624,706
95124 Butler Yankee Road Between Lafayette Avenue and Oxford State Road Reconstruct roadway including left turn lanes and improved curb and gutter maintenance/reconstruction 4/4/2017 $7,679,398
96493 Butler Yankee Road Dutchland Pkwy to Princeton Road Widen from 2 to 3 lane, convert Yankee/Princeton intersection to roundabout, add sidewalk. traffic operations/safety 5/4/2017 $5,078,687
AJ Jolly Campbell AJ Jolly Trailside AJ Jolly Park Construct 9,000 sq ft trailhead parking lot and paved trails within park bicycle/pedestrian/other FY16 $200,000
RTP-1 Campbell Alexandria Community Park Alexandria Community Park Parking lot asphalting, athletic trail completion, ashpalt overlay of Connector Trail & park benches bicycle/pedestrian/other FY18 $70,000
6-427 Campbell Carothers Road Monmouth Street to right turn lane into Newport Shopping Center Roadway rehabilitation maintenance/reconstruction FY17 $1,387,409
6-369 Campbell Combs Hehl Bridge Rehab IR 275 Combs Hehl Bridge over Ohio River Bridge Rehabilitation bridge/culvert replacement FY18 $6,675,000
6-1095 Campbell Covert Run Pike Bridge Bridge replacement over Covert Run Pike (CR 1363) over a tributary to Taylor Creek Bridge replacement (toll credits) bridge/culvert replacement UNSC $175,000
6-1076 Campbell CS 1193 On CS 1193 over Taylor Creek, 1.0 miles N of KY 1120. MP .733 to .833 (toll credits) Bridge replacement (Admin. Mod. #9, 6-10-14) bridge 7/6/2016 $1,790,000
6-3705 Campbell Dayton Riverfront Commons Along the Ohio River from O'Fallon Avenue to Berry Street in Dayton Construct a one mile pedestrian and bicycle trail bicycle/pedestrian/other FY16 $675,484
6-3505 Campbell Dayton Safe Routes to School Along west side of Dayton Pk from Chateau Dr to 7th St. Sidewalk widening of 500/600 blocks on 6th. Connect north and south Dayton by constructing new sidewalks and new roadway markings bicycle/pedestrian/other FY18 $309,200
RTP-2 Campbell Fort Thomas Ohio River Riverfront Trail Along the banks of the Ohio River, next to Mary Ingles Highway Construct a 5,800 ft. trail, 4-6 ft. wide natural surface for walking, biking, access to canoeing bicycle/pedestrian/other FY18 $61,572
6-8105.06 Campbell I-275/AA Connector Johns Hill Road to AA Highway (KY 9) Toll credits as match New road connecting the AA highway to NKU widening/relocation UNSC $15,030,000
6-8105.00 Campbell I-275/AA Connector Between I-275 and the AA Highway (KY 9) New road connecting the AA highway to NKU widening/relocation 1Q22 $27,815,000
6-8104.00 Campbell IR 471 KY 8 interchange Construct a new southbound off-ramp from I-471 to KY 8 widening/relocation FY23 $32,640,000
6-183.00 Campbell IR 471 The I-471 Corridor (MP 0.00 to 5.016) Study and rehabilitate the I-471 corridor (toll credits) traffic operations/safety FY17 $1,670,000
6-1077 Campbell KY 10 Bridge over 12 Mile Creek, SE of KY 1997 (SR 15.1) Bridge replacement, toll credits bridge/culvert replacement 12/12/2017 $2,020,000
6-9006 Campbell KY 10 MP 4.42 to MP 13.60 Low cost safety improvements traffic operations/safety 5/31/2017 $250,000
6-352 Campbell KY 536 US 27 to AA Highway (KY 9) Extension of existing roadway widening/relocation FY22 $63,840,000
6-1085 Campbell KY 8 Bridge over 12 Mile Creek, 0.1 miles north of Neises Road Bridge replacement (toll credits) bridge/culvert replacement FY21 $2,120,000
6-3214 Campbell KY 8 Sidewalk Phase 2 South side of KY 8 from KY 8 to KY 547 Upgrade 1400' of sidewalk bicycle/pedestrian/other FY18 $196,259
6-407 Campbell KY 9 KY 9 at MP 21.8 Reconstruct railroad underpass (toll credits) bridge/culvert replacement FY18 $3,481,000
6-8101.25 Campbell KY 9 North of 10th Street to 5th Street Reconstruct KY 9 along a new route widening/relocation 8/4/2017 $4,000,000
NP8 Campbell Newport Red Bike Newport Expansion of Red Bike into the City of Newport bicycle/pedestrian/other FY18 $121,818
6-434 Campbell Newport Riverfront Commons Newport Riverfront Construct 2 bridges in connection with the Riverfront Commons project bicycle/pedestrian/other FY17 $1,481,784
6-3216 Campbell North Ft. Thomas Sidewalk North Fort Thomas Av from Covert Run to Northridge Lane New 5' sidewalk parallel to N. Ft. Thomas Avenue bicycle/pedestrian/other FY18 $651,530
6-3201 Campbell Purple People Bridge Purple People Bridge over the Ohio River Rehabilitation of bridge maintenance/reconstruction FY16 $213,504
6-453.00 Campbell Riverfront Commons Berry Street to Fourth Avenue 15' wide concrete bicycle/pedestrian trail and conduit for future lighting. Part of 11.5 mi project bicycle/pedestrian/other FY20 $1,123,500
6-3207 Campbell Silver Grove KY 8 Sidewalks 5' sidewalk from Morschel to Maple; 8' trail from Silver Grove Motors to Kay Wright Construct sidewalk and trail on south side of KY 8 in Silver Grove bicycle/pedestrian/other FY17 $391,816
6-3508 Campbell Silver Grove Safe Routes to School Four Mile Road from 3rd Street to Mary Ingles Hwy and also near Providence Trace Drive Construct sidewalks and a trail bicycle/pedestrian/other FY16 $250,000
6-8706 Campbell US 27 MP 17.9 in Pendleton County to MP 1.9 in Campbell County Reconstruct and widen US 27 widening/relocation FY18 $70,790,000
6-443 Campbell US 27 Southbound right lane from Marshall Lane to Johns Hill Road (KY 3490) Add lane to provide three continuous southbound through-lanes to Johns Hill Road. widening/relocation FY19 $875,000
6-451.00 Campbell US 27 (South Monmouth Ph1) Newport/Southgate city limits to Carothers Road South Monmouth Phase 1. Improve/add sidewalks, access management, street lighting, improve safety. access management FY20 $4,072,700
6-452.00 Campbell US 27 South Monmouth Underpass Underpass of the CSX railroad bridge between 11th St and 13th St Improve for pedestrians by replacing obsolete stairs/walkway with 10' sidewalk, lighting bus stops bicycle/pedestrian/other FY21 $3,891,000
82552 Clermont Clepper Lane Existing Clepper Lane from Gate Drive to new interchange just east of Elick Lane/Bach-Buxton Road Reconstruction and realignment of existing and extend exted east widening/relocation 4Q19 $6,875,000
82582 Clermont CR 171 (Old SR 74) Olive Branch-Stonelick Rd. to Armstrong Blvd. (Amendment #7, 3-10-16, Mod. #9, 6-7-16) Widening to three lanes with 4 foot page shoulders and curb and gutter widening/relocation 10/12/2016 $5,910,986
82557 Clermont CR 171 (Old SR 74) Phase 1 Schoolhouse Road to Glen Este-Withamsville Road Widening from 2 to 5 lanes Glen Este-Withamsville to Tealtown; 3 lanes from Tealtown to Schoolhouse. widening/relocation 4Q19 $14,519,287
103594 Clermont CR 98 Little Miami Scenic trail across Loveland Avenue (CR 98) Installation of RRFB on Loveland Avenue to facilitate bicycle/pedestrian movement on trail bicycle/pedestrian/other 4Q18 $48,247
104712 Clermont ITS Phase 3 In and around Milford and along the US 50 and SR 28 corridors Interconnection of 15 traffic signals under municipal and ODOT jurisdiction traffic operations/safety 2Q20 $2,328,920
105055 Clermont Pierce Township Park Renovation 1,800 ft of multi use path extending the existing trails to the southwestern portion of the park Multi use path in Pierce Township Park bicycle/pedestrian/other 2Q20 $234,544
106413 Clermont SR 132 SR 132 at Chapel Road Install a modern roundabout at SR 132 traffic operations/safety 1Q21 $1,502,620
82370 Clermont SR 32 From 0.2 miles east of Eastgate Blvd. To Olive Branch Stonelick Road PE phase of a project on SR 32 to improve safety maintenance/reconstruction 1Q19 $3,167,999
99839 Clermont SR 32 Bells Lane at SR 32 and Old SR 74 Improvements at two intersections traffic operations/safety 4Q18 $3,849,830
103755 Clermont SR 32 Glen Este Withamsville Road to Olive Branch-Stonelick Road Construct a third lane EB along SR 32; resurface and pravement repair between I-275 and Batavia ECL widening/relocation 1Q19 $10,271,690
107292 Clermont US 50/SR 132 US 50 and SR 132 intersections in Village of Owensville Add turn lanes, curb, sidewalk, storm sewer, curb ramps and upgrade signals. traffic operations/safety 2Q23 $1,965,154
710275 Dearborn Bridge Consulting Statewide Payments to Kentucky bridge consulting traffic operations/safety 7/1/2016 $500,000
1297250 Dearborn Bridge Inspections Statewide Underwater bridge inspections (Amendment #10, 8-9-12) traffic operations/safety 6/30/2017 $1,200,000
1382761 Dearborn Bridge Inspections State and County Bridge Inspection Data (Amendment #1, 9-12-13) QA/QC program traffic operations/safety 7/1/2016 $250,000
1400933 Dearborn Bridge Inspections State and county bridges (Amendment #10, 9-11-14) 2015 QA/QC Program inspection data traffic operations/safety 7/1/2016 $250,000
1592456 Dearborn Bridge Inspections Carroll Cropper Bridge over the Ohio River (Amendment #5, 1-14-16) Single location bridge inspection (federal portion in FY 16, state match in FY 17) traffic operations/safety 7/1/2016 $100,000
88850 Dearborn Conwell Street Conwell Street from US 50 to Exporting Street Reconstruction maintenance/reconstruction 1/31/2018 $4,314,844
1382107 Dearborn County Bridge Inspections Dearborn County bridges 2014-2018 bridge inspections maintenance/reconstruction FY18 $267,100
1500202 Dearborn County Bridge Inspections Dearborn County Countywide bridge inspections in Dearborn County maintenance/reconstruction FY19 $261,240
1400725 Dearborn East Laughery Road Bridge #5 on East Laughery Road, east of Gregory Road Bridge replacement bridge/culvert replacement FY18 $1,125,000
1600719 Dearborn Harrison Brookville Road (Old US 52) Bridge #108 at Johnson Fork Road Bridge replacement bridge/culvert replacement FY21 $2,700,000
1601154 Dearborn Indefinite Delivery/Quantity Program Various projects on various roadways in Dearborn County (Amendment #10, 9-8-16) Patch and rehab pavement projects maintenance/reconstruction 6/30/2017 $1,029,500
1601704 Dearborn Indefinite Delivery/Quantity Program Various bridges in Dearborn County Bridge maintenance and repair projects maintenance/reconstruction 6/30/2017 $1,060,000
1702393 Dearborn Indiana State Police Various interstate routes throughout Indiana ISP patrols for specified contracts line items FY18 $2,000,000
1600460 Dearborn IR 1001 (Pribble Road) At CIN DOT #538034J railroad crossing near Greendale Railroad protection traffic operations/safety FY19 $340,000
1383444 Dearborn IR 1002 (Cold Springs Road) Between US 50 and SR 350 Bridge replacement, Bridge No. 24 bridge/culvert replacement FY19 $1,144,400
1500564 Dearborn IR 275 1.34 miles north of US 50 at Access Road NBL Bridge deck overlay project maintenance/reconstruction 3Q18 $1,076,336
1500129 Dearborn IR 74 Weigh Station west of the Ohio State Line Reconstruct the weigh station in West Harrison maintenance/reconstruction FY19 $1,100,000
1593034 Dearborn IR 74 3.27 miles east of SR 101, St. Peters Road over IR 74. (Amendment #7, 3-10-16) Bridge deck overlay maintenance/reconstruction 2Q19 $708,000
1700693 Dearborn Lawrenceburg Trail Connector 4370' connecting City of Lawrenceburg to the City of Greendale Pedestrian/bicycle asphalt trail, retaining wall with guardrail, boardwalk, crosswalk bicycle/pedestrian/other FY19 $1,716,748
1600706 Dearborn Market Street 5th Street to Dutch Hollow Road Pavement reconstruction, minor realignment, slope corrections and elimination of roadway hazards. maintenance/reconstruction 1Q21 $2,875,000
1383639 Dearborn Mobility Consulting Statewide Traffic Management System Project traffic operations/safety FY18 $1,200,000
1383641 Dearborn Mobility Consulting Statewide Traffic Management System Project traffic operations/safety FY18 $1,500,000
1173877 Dearborn New Weigh Stations Statewide New weigh station project traffic operations/safety 6/30/2017 $100,000
1298581 Dearborn SR 1 6 miles south of IR 74 at RP 9+70 to 9+90 Slide correction maintenance/reconstruction 4Q18 $2,761,580
1500092 Dearborn SR 1 At Guilford Slide correction project maintenance/reconstruction 2Q20 $3,506,069
NP-CMAQ2 Dearborn SR 1 SR 1 @ US 50, SR 1 @ Belleview/Ridge, SR 1 @ Oberting Intersection Improvements including realignement, turn lanes and signal adjustments traffic operations/safety FY19 $1,612,675
1700136 Dearborn SR 1 Intersection of SR 1 and Oberting Road New Signal Installation traffic operations/safety 2Q21 $280,000
1298617 Dearborn SR 262 3.9 miles south of US 50 at RP 3+9 to 4+0 Slide correction maintenance/reconstruction 1Q18 $1,024,600
1383701 Dearborn SR 46 2.81 miles west of SR 1 over East Fork of Tanners Creek Bridge deck replacement maintenance/reconstruction FY19 $1,362,100
1500550 Dearborn SR 46 1.14 miles east of SR 1 at Logan Creek Bridge replacement (concrete) maintenance/reconstruction 3Q20 $908,136
1500551 Dearborn SR 46 1.28 miles east of SR 1 at Logan Creek Bridge replacement, concrete bridge/culvert replacement 3Q20 $997,338
1500552 Dearborn SR 46 2.35 miles east of SR 1 at Logan Creek Bridge replacement (concrete) project bridge/culvert replacement 3Q20 $943,139
1600539 Dearborn SR 46 3.2 miles east of SR 1 Erosion control maintenance/reconstruction 2Q21 $803,625
710061 Dearborn SR 62 3.64 miles east of the Ripley/Dearborn County line Erosion/landslide control (Adm Mod #7, 4-8-14, Amend #10, 9-11-14, Adm Mod #15, 4-7-15) maintenance/reconstruction 8/10/2016 $2,077,000
1298588 Dearborn SR 62 4.6 miles west of SR 262 Slide correction maintenance/reconstruction 2Q18 $2,498,808
1383726 Dearborn SR 62 3.7 miles west of SR 262 over Hayes Branch Bridge deck replacement maintenance/reconstruction 1Q20 $851,824
1400675 Dearborn State Line Road 1600' south to 400' north of Georgetown Road Roadway realignment traffic operations/safety 1Q20 $1,490,745
1297452 Dearborn Statewide Bridge Inspections Statewide Statewide fracture critical inspections in all MPO areas--non border bridges traffic operations/safety 6/30/2017 $1,000,000
1297613 Dearborn Statewide Bridge Inspections Various locations in Indiana (Amendment #1, 9-12-13) Statewide bridge inspections traffic operations/safety 6/30/2017 $50,000
1297115 Dearborn Traffic Mgmt System Project Statewide Traffic Management System Project traffic operations/safety 6/30/2017 $1,092,000
1297113 Dearborn Traffic Mgmt System Project Statewide Traffic Management System Project traffic operations/safety 6/30/2017 $1,300,000
1297116 Dearborn Traffic Mgmt System Project Statewide Traffic Management System Project traffic operations/safety 6/30/2017 $230,000
1600644 Dearborn UPWP-OKI Planning For Planning Purposes, PL and STP studies FY21 $250,000
1298586 Dearborn US 50 0.1 miles west of Wilson Creek Road at RP 161+60 to 161+70 Slide correction maintenance/reconstruction FY18 $3,968,000
1401461 Dearborn US 50 2.97 miles east of SR 148 over Tanners Creek and service road (Admin Mod #3, 11-10-15) Bridge deck overlay maintenance/reconstruction 12/8/2016 $518,919
1500566 Dearborn US 50 0.09 miles east of SR 56 at Hogan Creek Bridge deck overlay project maintenance/reconstruction FY18 $150,000
1592645 Dearborn US 50 From SR 1 to the Ohio State Line HMA Overlay, preventive maintenance maintenance/reconstruction 2Q19 $1,114,600
1400080 Dearborn US 52 6.48 miles east of the East SR 1 junction over an unnamed tributary to the Whitewater River Small structure replacement bridge/culvert replacement UNSC $60,000
901832 Dearborn Weigh Station Modernization Statewide Weight station modernization project traffic operations/safety 6/30/2017 $85,000
105162 Hamilton Auburn Avenue Dorchester Av to Gilman Av Widen existing lanes and add center turn lane. Realign Huntington Pl with drive to Juvenile Center. traffic operations/safety 2Q21 $4,910,136
103358 Hamilton Banks Variable Message Signs 4 interstate locations in the Banks area Install cantilever style dynamic message signs coordinated with the OHGO system traffic operations/safety 1/18/2018 $769,419
104409 Hamilton Banks Variable Signs Phase 2 City of Cincinnati along US 50, Second and Third Streets Develop/install VMS with ground mounted signage and handrails, includes parking availability ITS 4Q18 $5,000,000
105058 Hamilton Bassett Road Improvements Bassett Road between Fairbanks and Woodlawn Avenue Sidewalks along Bassett Road along one side of the road between Fairbanks and Woodlawn bicycle/pedestrian/other 2Q20 $700,000
98769 Hamilton Blue Ash Rd (CR 251) From Matson Road to Galbraith Road Rehabe and repair existing pavement, storm water improvements, sidewalks, bus shelters maintenance/reconstruction 4Q19 $7,159,477
94519 Hamilton Cincinnati Bulk Terminals Cincinnati Bulk Terminal facility Enhance railroad infrastructure within last 1/4 mile of CIND up to the bulk terminal facility traffic operations/safety 3Q18 $1,282,620
101886 Hamilton Cincinnati CTCS Zone 9 City of Cincinnati's traffic signal zone 9 Install fiber optic interconnect cable, upgrade existing traffic signals, new signal controllers maintenance/reconstruction 11/3/2017 $4,323,680
94484 Hamilton Cincinnati Traffic Signals Zone 1 130 signalized intersections in CBD bounded by Mehring Way, Central Pkwy, Central Ave, Eggleston Ave Install underground duct bank with fiber optic interconnect cable, upgrade signals to LED technology traffic operations/safety 1/8/2018 $7,336,551
94518 Hamilton Cinti Barge and Rail Riverside Drive, downtown Cincinnati (Admin. Mod #9, 6-7-16) Upgrade Barge and Rail Terminal bicycle/pedestrian/other 8/12/2016 $1,220,362
95282 Hamilton CR 73 (Cheviot Road) North Bend Road to Jessup Road Pavement rehabilitation and addition of NB turn lane from Tallahassee Drive ending at Jessup Road traffic operations/safety 4Q18 $5,954,285
105831 Hamilton Deer Park Community Bike/Pedestrian Network St. John's Terrace, Blue Ash Road and Orchard Lane. Paved Multi-use path. Pavement replacement, resurfacing and RR crossing for ADA compliant access. bicycle/pedestrian/other 2Q20 $1,130,000
22970 Hamilton Eastern Corridor Study Cincinnati CBD to west central Clermont County Eastern Corridor multi-modal project study with capacity improvements studies FY15 $19,205,950
98109 Hamilton Elmore Street Connector West of IR 74 to Central Parkway near Cincinnati State Technical College Construct a new roadway over IR 74 widening/relocation 2Q21 $2,882,612
88135 Hamilton GE Parkway Shepherd Lane to Glendale Milford Road Phase 2 of the Thru the Valley Project--add local roadway connection on eastside of IR 75 widening/relocation UNSC $5,400,000
105763 Hamilton Harrison Avenue Wesselman Road to Harrison Greene SC Widening of existing lanes and install sidewalk. Construct shared-use path to South Filview Circle. traffic operations/safety 2Q20 $9,007,351
100031 Hamilton Harrison Avenue Bike Path Adjacent to Harrison Avenue - 3700 LF from Marie Avenue to Lee Court Construction of a 12 foot wide Hike/Bike Trail bicycle/pedestrian/other 3Q18 $995,000
106228 Hamilton Harrison Avenue-Pedestrian & Safety Improvements Westwood, east side of Harrison Avenue between Urwiler and Montana New sidewalks, curb & gutter, and lighting bicycle/pedestrian/other 2Q20 $375,000
105181 Hamilton Hauck Road Reading Rd to US 42 (Lebanon Rd) Reconstruct and add center turn lane with curb, gutter and sidewalk on north side maintenance/reconstruction 2Q21 $4,801,700
106185 Hamilton Hutchinson Road Bike Path Bridge Hutchinson Road west of Filview Circle Construction of a bike path bridge over Hutchinson Road to connect Harrison Avenue bike path bicycle/pedestrian/other 2Q20 $875,000
104668 Hamilton I-74 I-74/75 Interchange Phase 5b of MCE, split from PID 83723. Interchange and I-75 ramps to I-74 WB widening/relocation 4Q20 $96,836,400
84492 Hamilton IR 275 SLM 39.81 to 41.36--just before Four Mile Road to the Ohio River Resurface and pavement repair PE phase listed in Line Items section maintenance/reconstruction 3Q18 $31,123,872
106411 Hamilton IR 275 I-275 & US 42 Interchange Ramp improvements at the I-275 & US 42 interchange; reassign lane usage on US 42 through Hauck Rd traffic operations/safety 2Q21 $2,639,193
89077 Hamilton IR 71 Part of the Brent Spence Bridge project Ohio's share of design and construction of the new Ohio River Bridge widening/relocation 1Q20 $3,424,200
82975 Hamilton IR 71 Lytle Tunnel to Madeira corporate line Plane and pave. Highway signs added to the project maintenance/reconstruction 2/23/2017 $27,019,266
94741 Hamilton IR 71 0.1 mi south of Williams Avenue Overpass to 0.04 mi north of Red Bank (SLM 6.86-9.74) Widen NB IR 71 for 3 continuous thru lanes thru the SR 562 interchange widening/relocation 3Q18 $1,721,917
91826 Hamilton IR 71 From SR 562 to SR 126 Plane and pave a portion of IR 71. Highway signs included. maintenance/reconstruction 3Q18 $36,996,016
77628 Hamilton IR 71 I-71 Interchange @ MLK SIB Loan Debt Service debt service 4Q26 $25,000,000
76256 Hamilton IR 75 Glendale Milford Road to IR 275 Phase 8 of Thru the Valley Project--includes major rehabilitation and widening. widening/relocation 2Q20 $11,661,404
82288 Hamilton IR 75 0.3 mi S of Shepherd to 0.2 mi N of Glendale-Milford Phase 1 of Thru the Valley Project-reconstruct IR 75 between Shepherd Lane and Glendale-Milford Road widening/relocation 4/7/2017 $115,367,506
77889 Hamilton IR 75 From south of SR 562 to north of SR 4 Phases 8 and 8A of the Mill Creek Expressway Project--widening & reconstruct interchanges as needed widening/relocation 4Q20 $20,342,300
89068 Hamilton IR 75 Brent Spence Bridge (Ohio only) Detailed design, ROW and Construction phases of the Brent Spence Bridge project widening/relocation 1Q20 $143,988,273
83723 Hamilton IR 75 Monmouth overpass to just south of Clifton Phase 5 of the Mill Creek Expressway--Add a lane to IR 75 and reconfigure the IR74/75 interchange widening/relocation 2Q18 $175,918,825
88124 Hamilton IR 75 From bridge at MP 9.99 to MP 10.87 (SR 126) Phase 3 of the Thru the Valley Project--add 4th lane in each direction and associated improvements widening/relocation 1Q24 $1,637,702
88129 Hamilton IR 75 Railroad bridge 11.09 on southbound IR 75 in the split Phase 4 of the Thru the Valley Project--replace railroad bridge prior to widening IR 75 bridge/culvert replacement 1Q22 $2,631,244
88133 Hamilton IR 75 Between Galbraith Rd and Shepherd Ln, NB only Phase 6 of the Thru the Valley Project--add 4th lane and auxiliary lane (includes part of Phase 7) widening/relocation 2Q27 $7,341,327
88132 Hamilton IR 75 Between Galbraith Rd and Shepherd Ln, SB only Phase 5 of the Thru the Valley Project-add 4th lane (includes part of Phase 7) widening/relocation 2Q23 $3,200,000
104667 Hamilton IR 75 Between Hopple and Mitchell, I-74 EB ramps to I-75 NB and SB Phase 5a of MCE-add 4th lane and reconfigures IR 74 EB ramps to IR 75 widening/relocation 4Q18 $93,964,290
105851 Hamilton IR 75 OH/KY state line to 3.00 MM Demolition of structures required for the Brent Spence Bridge project (PID 89068) widening/relocation 10/13/2017 $770,000
105184 Hamilton Kemper Road Shared Use Path North side of Kemper Rd from SR42 to Sharon Woods Paved shared use path on Kemper Road bicycle/pedestrian/other 2Q21 $659,800
104944 Hamilton Kenwood Road Montgomery Road (US 22) Intersection Add SB right-turn lane and divider on approach to Montgomery Rd. Add multi-use path along eastside. traffic operations/safety 2Q20 $2,149,535
107295 Hamilton Little Miami Scenic Trail-Beechmont Connector Connecting existing trail termini north of Beechmont Av and Lunken Loop trail. Construct 12' wide multi-use trail,crossing LMR via new bridge, utilizing existing bridge foundation bicycle/pedestrian/other 2Q21 $5,400,000
99954 Hamilton Montgomery Rd (US 22) Sidewalks East side of Montgomery Road from Weller Road to Bethesda North Hospital main entrance Construct new sideawalks along east side of Montgomery Rd bicycle/pedestrian/other 4/13/2017 $587,646
103392 Hamilton Montgomery Road (US 22) Sidewalks West side of road from Dearwester Dr. to existing sidewalk 375' south of Pinehurst Lane Construction of new sidewalk bicycle/pedestrian/other 2Q20 $1,176,367
104934 Hamilton Montgomery Road Sidewalks Phase 2 East side of Montgomery Rd from School House Lane to Radabaugh Drive New Sidewalks along the east side of Montgomery Road bicycle/pedestrian/other 1Q21 $548,257
100821 Hamilton Mt. Adams Inspection FY 18-20 Mt. Adams Inspection, monitoring and maintenance of the Mt. Adams Slope Stability System--3 year constract maintenance/reconstruction 1Q18 $900,000
107296 Hamilton Mt. Healthy Signal System Phase 2 US 127 (Hamilton Av) and Compton Road Upgrade 14 traffic signals. traffic operations/safety 3Q21 $1,154,108
94491 Hamilton ORT Salem to Sutton East side of Kellogg Avenue between Salem and Sutton Roads Construct 10' wide bike path and 5' side path with retaining walls to accommodate grading bicycle/pedestrian/other 1Q20 $5,000,000
100046 Hamilton ORT West Segment 1 Phase 1-Evans Recreational area to State Street Construction of Ohio River Trail 10' wide bicycle trail--segment 1 bicycle/pedestrian/other 2Q20 $482,333
100047 Hamilton ORT West Segment 2 Phase 2-Fairbanks Avenue (near Boldface Park) to the Gilday Riverside Playfield Construction of Ohio River Trail 10' wide bicycle trail--segment 2 bicycle/pedestrian/other 1Q20 $919,858
103416 Hamilton Plainfield Road Intersections with EB SR 126 ramps, Hunt Road and Peppermill Ln/Reed Hartman Hwy Conversion of three signalized intersections to multi-lane modern roundabouts traffic operations/safety 3Q21 $13,934,338
86461 Hamilton Red Bank Road (SR 32F) Red Bank Road and Red Bank Expressway PE and environmental analyses to consolidate, manage access points traffic operations/safety 2Q23 $3,554,235
98760 Hamilton SR 125 Both sides of Beechmont Avenue Install 6' wide sidewalks on Beechmont Avenue (SR 125), new bus pull-offs near Wolfangel Road. bicycle/pedestrian/other 4/20/2017 $2,402,608
104936 Hamilton SR 126/US 22 SR 126 (Ronald Reagan Cross County) at US 22 (Montgomery Rd) Interchange Construct multi-lane roundabout to replace/modify existing partial clover interchange traffic operations/safety 2Q20 $9,325,029
100032 Hamilton SR 264 (Bridgetown Road Sidewalks) Southside of Bridgetown Road Construct a new sidewalk bicycle/pedestrian/other 2/1/2018 $1,024,952
88790 Hamilton SR 264 (Bridgetown Road) Intersection of SR 264/Taylor/Bridgetown Improve intersection by improving 5 leg intersection to 4 leg intersection, relocate Taylor Road widening/relocation 3/13/2017 $5,481,393
25349 Hamilton SR 264 (Glenway Avenue) From 4.15 to 4.22 miles north of US 50. Remove Bridge No. HAM-264-1044, SFN:3111547, over abandoned RR. Reconstruct road on new embankment bridge/culvert replacement 3Q19 $672,000
106412 Hamilton SR 32 Between Little Dry Run and the Newtown E corp line Study to install a two-way left turn lane and right turn lane studies UNSC $47,699
98767 Hamilton SR 4 Southern corporate to northern corporate limits of Wyoming Pavement rehabilitation, curb replacement, road diet and addition of bike lanes traffic operations/safety 4Q18 $8,074,640
89835 Hamilton SR 4/SR 561 Bridge No. HAM-75-0701, Seymour Avenue over IR 75 Bridge replacement (Phase 8A of MCE) bridge/culvert replacement 6/9/2017 $8,559,410
98763 Hamilton Sycamore Interconnect Throughout Sycamore Township Install fiber optic interconnect cable; PTZ cameras at signalized intersections traffic operations/safety 7/27/2016 $1,573,439
98764 Hamilton Sycamore Road Along Sycamore Road from Kenwood Road to Plainfield Road Improvements to 3 intersections including roundabout at Sycamore and Plainfield. Install sidewalk traffic operations/safety 2Q19 $7,884,615
107301 Hamilton US 22 US 22 (Montgomery Road) at Highland Av, Sampson Ln, Plainfield Rd, and Elwynne Dr. Upgrade signals at Higland, Sampson and Elwynne. Upgrade signal at Plainfield. Access management. traffic operations/safety 3Q22 $2,968,557
99837 Hamilton US 22 (Montgomery Road) Norwood corporate line to Silverton corporate line Install 5 lane cross section and upgrade all traffic signals along corridor traffic operations/safety 3Q19 $2,500,000
99782 Hamilton US 27 Intersections with Liberty Street and Central Parkway Replace existing signal equipment at Liberty Street, modify geometry at Central Pkwy. traffic operations/safety 5/9/2017 $361,000
106404 Hamilton US 27 Banning to Byrnside Install sidewalk on the west side of US 27; painted crosswalks, ADA curb ramps, concrete median bicycle/pedestrian/other 1Q21 $677,773
104942 Hamilton US 42 (Reading Rd) 32 locations in the City of Reading Retrofit 26 signals to LED, replace 3 school flashers, one 4-way flasher and two 3-way flashers maintenance/reconstruction 1/30/2018 $367,000
101578 Hamilton US 42 (Reading Road) Inwood Drive north to the corporation line with Sharonville Repair and resurface maintenance/reconstruction 9/28/2017 $992,100
91939 Hamilton US 50 0.02 miles to 0.16 miles east of SR 128 and on US 50/Columbia Pkwy ramp to 5th St truss structure Rehabilitate Bridge HAM-50-0376L and HAM-50-2180N maintenance/reconstruction 3/9/2017 $5,363,867
105168 Hamilton Wasson Way Trail Phase 2a 1,300 feet over I-71 between Tamarack Avenue and Elsmere Avenue 12'-14' shared use path and parallel 6'-8' wide pedestrian path bicycle/pedestrian/other 3Q19 $2,441,221
105349 Hamilton Western Hills Viaduct Western Hills Viaduct Replacement of existing viaduct Phase 8(Split from PID 85388) maintenance/reconstruction 4Q25 $11,000,000
105314 Hamilton Western Hills Viaduct Western Approach to WHV Early Acquisition of RW. Fill and grade western approach to the WHV. bridge/culvert replacement 2Q19 $6,350,000
98757 Hamilton Westwood Trail Phase 2 Dunham Recreation Center to Western Hills University and Dater High Schools and Western Hills Sports Extension of existing multi-use trail bicycle/pedestrian/other 5/15/2017 $882,700
98772 Hamilton Winton Road (CR 239) Fleming Road to Sarbrook Drive Pavement rehabilitation, widening for left turn lanes at several locations, sidewalks maintenance/reconstruction 4Q18 $4,830,000
96339 Hamilton Wolfangel Sidewalks Wolfangel Road between Beechmont Avenue and State Road in Anderson (Res. 2013-22, 6-13-13) Construct new sidewalks on the east side of Wolfangel Road bicycle/pedestrian 7/13/2016 $937,400
6-457.00 Kenton 7th Street Washington St to Greenup St Sidewalk replaceme,underground utilities,street trees, mast arm traffic signals, lighting, resurface maintenance/reconstruction FY19 $3,747,500
6-454.00 Kenton Adela Avenue KY 1072 (Sleepy Hollow Road/Deverill St) to KY 8 (Elm St) Curb-line milling, asphalt resurfacing, replace sidewalk/curbing. New sidewalk as needed. maintenance/reconstruction FY18 $323,750
6-438 Kenton Amsterdam Road General Drive to Redwood Drive Reconstruct roadway with curb and gutter, storm sewers and sidewalk maintenance/reconstruction FY19 $3,131,000
6-3213 Kenton Amsterdam Road (KY 371) Connector South side of Amsterdam Rd from Highwater to Bromley-Cresecent Springs & Villa Hills New sidewalk bicycle/pedestrian/other FY18 $775,829
6-419.01 Kenton Bromley Crescent Springs Phase 2 Between the two segments of Amsterdam Road Reconstruct Bromley Crescent Springs Road and improve intersection with St. Johns Road maintenance/reconstruction FY20 $2,012,000
6-419 Kenton Bromley-Crescent Springs Rd. Anderson Road to Amsterdam Road Phase 1. Horizontal and vertical design improvements, addition of multi-use path traffic operations/safety FY19 $7,236,000
6-437 Kenton Buttermilk Pike Buttermilk Pike in Villa Hills Improve water flow and drainage issues on a .527 mile section of Buttermilk Pike maintenance/reconstruction FY18 $636,714
6-455.00 Kenton Cody Road Banklick Creek to Independence Station Road Replace culvert for Banklick Creek. Mill and overlay with new asphalt. bridge/culvert replacement FY19 $661,750
6-3210 Kenton Covington 6th District Sidewalks Various streets near the 6th District Elementary School Replace poor sidewalks, provide ADA curb ramps, install new stop bars and crosswalks bicycle/pedestrian/other FY18 $259,291
6-3206 Kenton Covington Licking Greenway City of Covington Construct an 8' levee trail in the City of Covington bicycle/pedestrian/other FY18 $497,936
6-3706 Kenton Covington Riverfront Commons From Greenup Street to the lookout area on Madison Avenue Construct a continuous walking and biking path bicycle/pedestrian/other FY17 $4,904,888
6-8954 Kenton CR 1021 Bridge replacement on Ernest Bridge Drive (CR 1021) over the CSX RR (toll credits) Bridge replacement bridge/culvert replacement FY18 $3,150,000
6-441 Kenton Dolwick Connector Dolwick Road to Mineola Pike to Olympic Blvd. Construct new sidewalks, dedicated bicycle lanes and retaining walls bicycle/pedestrian/other FY19 $2,644,000
6-428.00 Kenton Dudley Road Winding Trails to Catherine Drive Resurface and stabilize the roadway (Design portions for phases 1 and 2) maintenance/reconstruction FY17 $170,000
6-428.10 Kenton Dudley Road Phase 1 Winding Trails to Thomas More Parkway Resurface and stabilize the roadway maintenance/reconstruction FY17 $1,740,000
6-428.20 Kenton Dudley Road Phase 2 Thomas More Parkway to Catherine Drive Resurface and stabilize the roadway maintenance/reconstruction FY17 $1,540,000
6-428.30 Kenton Dudley Road Phase 3 Catherine Drive to the Summit Hills Country Club entrance Roadway resurfacing and stabilization. Construct consistent 11' travel lane in each direction. maintenance/reconstruction FY19 $2,126,667
6-428.40 Kenton Dudley Road Phase 4 Summit Hills Country Club entrance to Dixie Highway Roadway resurfacing and stabilization. Construct consistent 11' travel lane in each direction. maintenance/reconstruction FY20 $3,225,667
6-435 Kenton Electric Alley Pedestrian Improvements Between 5th and 6th Streets in Covington Construct pedestrian improvements including lightin and bike/ped path; closing alley to vehicles bicycle/pedestrian/other FY16 $1,275,000
6-2057 Kenton IR 71/75 NB from MP 183.191 to 184.74 and SB from MP 182.912 to 186.95 in Boone and Kenton Counties Repair and grind pavement maintenance/reconstruction FY18 $6,000,000
6-17.00 Kenton IR 75 MP 191.277 to 191.777--Brent Spence Bridge Initiate P/E and environmental studies to evaluate replacement of Brent Spence Bridge traffic operations/safety FY17 $4,039,964
6-17.03 Kenton IR 75 MP 191.277 to 191.777--Brent Spence Bridge Replace Brent Spence Bridge widening/relocation FY22 $3,958,787
6-17.04 Kenton IR 75 Brent Spence Bridge--MP 191.277 to 191.777 (toll credits) Brent Spence Bridge Project (additional project funds for maintenance repair and painting) maintenance/reconstruction 5/9/2017 $16,800,000
6-17.09 Kenton IR 75 Brent Spence Bridge--MP 191.277 to 191.777 (toll credits) Brent Spence Bridge Project (additional project funds for maintenance repair and painting) maintenance/reconstruction FY19 $30,000,000
6-17.05 Kenton IR 75 Brent Spence Bridge toll credits Replace Brent Spence Bridge Kenton County, Kentucky; funds for maintenance, repair and painting maintenance/reconstruction FY18 $1,500,000
6-17.10 Kenton IR 75 Brent Spence Bridge) toll credits Additional project funds for maintenance, repair and painting maintenance/reconstruction FY18 $13,700,000
6-430 Kenton Johnson Street From 3rd Street to the existing concrete section heading towards Madison Avenue Widen sidewalk & roadway reconstruction maintenance/reconstruction FY17 $891,000
6-287 Kenton KY 1072 (Kyles Lane) Align intersections of US 25 and Kyles Lane (KY 1072) toll credits Roadway realignment traffic operations/safety FY16 $1,787,000
6-1075 Kenton KY 1120 MP .571 to .671--Over CSX RR, 11th Street E of Russell Street (toll credits) Bridge Replacement bridge/culvert replacement FY18 $1,754,000
6-162.10 Kenton KY 1303 KY 536 to Beechgrove Elementary Reconstruct and widen to four lanes and center turn lane (toll credits as match) widening/relocation FY22 $14,000,000
6-8307.10 Kenton KY 1501 From KY 17 to Crystal Lake Drive Relocate Hands Pike maintenance/reconstruction FY17 $11,300,000
6-9014 Kenton KY 17 From KY 14 to 0.143 miles north of Hergott Drive (toll credits) Perform low cost safety improvements on KY 17 traffic operations/safety FY17 $1,775,000
6-9016 Kenton KY 1829 (Richardson Rd) from MP 1.7 to 2.25 Correct drop offs, improve ditching, remove trees in clear zone and install HFS maintenance/reconstruction FY17 $500,000
6-3203 Kenton KY 3716 Sidewalks City of Taylor Mill Construct sidewalks adjacent to KY 16 bicycle/pedestrian/other FY18 $300,000
6-162.01 Kenton KY 536 Boone County Line to KY 17--toll credits Reconstruct to 4 lane urban section with access mgmt. from east end of CSX RR, MP 0 to 4.50 widening/relocation UNSC $26,210,000
6-162.20 Kenton KY 536 East end of the NS RR bridge to KY 1303 Reconstruct KY 536 (toll credits) maintenance/reconstruction FY20 $12,500,000
6-429 Kenton Latonia Avenue Southern Avenue to near West 36th Street Roadway reconstruction maintenance/reconstruction FY17 $785,000
6-435 Kenton Ludlow Riverfront Commons Hooper to Ash Streets. Toll credits for Design. Construct a one-mile section of the Riverfront Commons project in the City of Ludlow bicycle/pedestrian/other FY17 $305,166
6-456.00 Kenton Madison Avenue 11th Street to 8th Street Underground utilites, street trees, mast arm poles, streetlights, resurfacing, signal improvements. maintenance/reconstruction FY19 $2,747,500
6-3211 Kenton Madison Pike Sidewalks Just north of McCullum Road to Locust Lane Construct sidewalks on both sides of Madison Pike bicycle/pedestrian/other FY18 $327,750
6-436 Kenton Ohio River Bridge Traffic Counters Five Ohio River Bridges in the region--Boone, Campbell and Kenton counties Install permanent radar traffic counters. Toll credits as match. traffic operations/safety 5/9/2017 $242,130
6-421 Kenton Riverfront Commons City of Ludlow east to Bellevue Pedestrian/bicycle trail connecting Ludlow, Covington, Newport and Bellevue. Toll credits for design bicycle/pedestrian/other FY17 $1,336,635
6-3209 Kenton Riverfront Commons Highway Avenue Connection West of the Brent Spence bridge up to the sidewalks along Highway Avenue in Covington Construct a multi-use path bicycle/pedestrian/other FY18 $1,230,000
6-418 Kenton Sixth Street 6th Street in Covington--Scott St. to Russell St. Pavement and sidewalk restoration, utilities placed underground maintenance/reconstruction FY18 $1,888,748
6-3205 Kenton Turkeyfoot Road Sidewalks Farmington Drive to 2681 Turkeyfoot Road Construct sidewalks, drainage and utility adjustments bicycle/pedestrian/other FY17 $147,500
6-8815 Kenton US 25 North Arlington to the Covington sidewalk system (toll credits) Sidewalk and curb construction bicycle/pedestrian/other FY18 $2,250,000
6-432 Kenton US 25 (Dixie Highway) Intersection with Beechwood Road Construct a left turn lane on the NB approach to Beechwood Road (toll credits) maintenance/reconstruction FY18 $1,860,500
6-1070 Kenton West 15th Street MP 0.164 to 0.198--Bridge over CSX RR in Covington (toll credits) Bridge replacement bridge/culvert replacement FY18 $3,690,000
103371 Warren Butler Warren Road Intersection of Butler Warren Road with Western Row/Barret Road Convert intersection to a modern roundabout. Improve curb, gutter, drainage, culvert and geometry. traffic operations/safety 2Q21 $1,930,204
93964 Warren IR 71 IR 71 at Western Row Road Convert existing partial interchange to full interchange with new ramps and auxiliary lanes widening/relocation 4/13/2017 $26,620,000
104844 Warren IR 71 Mason Montgomery Rd to SB I-71 New 2-lane ramp, improve signals, sidewalk on west side of MM Rd near Escort Dr, enhanced bus stop traffic operations/safety 2Q21 $7,316,400
98857 Warren Mason Montgomery/Bethany BikePath Fleckenstein Park and east side of Mason-Montgomery Road Construction of a bike path to connect an existing bike path bicycle/pedestrian/other 3/6/2017 $625,000
100885 Warren Mason Snider Road Mason & Snider Road intersection and Snider & Thornberry Court intersection Reconstruction of existing intersections into single lane roundabouts traffic operations/safety 3Q20 $2,600,716
105175 Warren Mason-Lebanon Bike Path East property line of Ambleside Meadows along Muddy Creek and end at Lebanon Trail Paved Multi use path in Mason connecting to Lebanon bicycle/pedestrian/other 2Q21 $620,476
81481 Warren SR 132 From 0.44 to 0.54 miles north of SR 123 Rehabilitate bridge WAR-132-0553, including deck replacement bridge/culvert replacement 3Q22 $1,225,980
94494 Warren SR 48 Intersection with Mason Morrow Millgrove Road (Admin. Mod #2, 8-6-13, Amendment #3, 11-14-13) SR 48 widened to accommodate future turn lengths based on TIS completed by Village of South Lebanon traffic operations/safety 12/2/2016 $3,448,012
100882 Warren SR 741 Intersection of SR 741 and Parkside Intersection improvement project traffic operations/safety 3Q20 $6,328,462
103753 Warren SR 741 Between Spy Glass Hill and Weldon Drive Widen SR 741 to 2 travel lanes each direction with left turn lanes at all intersections. widening/relocation 2Q21 $6,846,910
81627 Warren US 42 SLM 17.94 to 24.74 in Warren County; 0.00 to 1.99 in Greene County Rehabilitate culverts in the 4-lane section of US 42 in northern Warren and southern Greene counties maintenance/reconstruction 2Q18 $1,850,000
107302 Warren US 42 Intersections at Bethany Road and Mason-Morrow-Millgrove Road Convert two existing stop controlled "T" intersections to roundabouts. Add multi-use path. traffic operations/safety 2Q22 $3,439,379
PID County Facility Location Description Project_Type Award Date Total_Cost

Transit Projects

Transit System Name State FY Project Description PID Type Total Project Cost $
BCRTA 2018 FY 18 Operating Assistance-Special Rule 94889 Operating $2,000,000.00
BCRTA 2018 Preventive Maintenance 94891 Capital $375,000.00
BCRTA 2018 Preventive Maintenance 94891 Capital $133,831.00
BCRTA 2018 Small replacement buses 94892 Capital $187,500.00
BCRTA 2018 Small Replacement Buses 94892 Capital $281,250.00
BCRTA 2018 Security Equipment 94894 Capital $18,750.00
BCRTA 2018 Shop/Office Equipment 94895 Capital $43,750.00
BCRTA 2018 Transit Enhancements 94896 Capital $18,750.00
BCRTA 2018 ADA 97835 Capital $187,500.00
BCRTA 2018 LTV buses 99800 Capital $97,500.00
BCRTA 2018 35' buses 99800 Capital $1,152,500.00
BCRTA 2018 Software/ hardware 104398 Capital $180,000.00
BCRTA 2018 Facility improvements 104453 Capital $62,500.00
BCRTA 2019 FY 19 Operating Assistance-Special Rule 94889 Operating $2,000,000.00
BCRTA 2019 Preventive Maintenance 94891 Capital $375,000.00
BCRTA 2019 Small Replacement Buses 94892 Capital $281,250.00
BCRTA 2019 Small replacement buses 94892 Capital $187,500.00
BCRTA 2019 Security Equipment 94894 Capital $18,750.00
BCRTA 2019 Shop/Office Equipment 94895 Capital $43,750.00
BCRTA 2019 Transit Enhancements 94896 Capital $18,750.00
BCRTA 2019 35' Bus Replacements 94897 Capital $2,281,505.00
BCRTA 2019 ADA 97835 Capital $187,500.00
BCRTA 2019 LTV buses 99799 Capital $491,198.00
BCRTA 2019 35' buses 99799 Capital $1,127,500.00
BCRTA 2019 Software/ hardware 104398 Capital $180,000.00
BCRTA 2019 Facility improvements 104453 Capital $62,500.00
BCRTA 2020 Bus replacements 103348 Capital $1,116,956.00
BCRTA 2020 Operating assistance 104272 Operating $2,000,000.00
BCRTA 2020 Preventive Maintenance 104280 Capital $375,000.00
BCRTA 2020 ADA Operating 104384 Operating $187,500.00
BCRTA 2020 Security equipment 104389 Capital $18,750.00
BCRTA 2020 Shop/Office equipment 104394 Capital $43,750.00
BCRTA 2020 Software/ hardware 104398 Capital $180,000.00
BCRTA 2020 Transit enhancement 104400 Capital $18,750.00
BCRTA 2020 Small buses 104401 Capital $281,250.00
BCRTA 2020 Small buses 104401 Capital $187,500.00
BCRTA 2020 Facility improvements 104453 Capital $62,500.00
BCRTA 2020 Replacement vans 104647 Capital $194,960.00
BCRTA 2020 Replacement buses 104647 Capital $635,952.00
BCRTA 2021 Operating Assistance 104272 Operating $2,000,000.00
BCRTA 2021 Preventive Maintenance 104280 Capital $375,000.00
BCRTA 2021 ADA Operating 104384 Operating $187,500.00
BCRTA 2021 Security equipment 104389 Capital $18,750.00
BCRTA 2021 Shop/Office equipment 104394 Capital $43,750.00
BCRTA 2021 Software/ hardware 104398 Capital $180,000.00
BCRTA 2021 Transit enhancements 104400 Capital $18,750.00
BCRTA 2021 Small buses 104401 Capital $281,250.00
BCRTA 2021 Small buses 104401 Capital $187,500.00
BCRTA 2021 Facility improvements 104453 Capital $62,500.00
CTC 2018 Capitalized Maintenance 99239 Capital $220,000.00
CTC 2018 2018 Operating Assistance 99241 Operating $33,000.00
CTC 2018 2018 Operating Assistance 99241 Operating $640,840.00
CTC 2018 2018 Security Equipment 99243 Capital $15,000.00
CTC 2018 Transit Enhancements 99245 Capital $15,000.00
CTC 2018 Short Range Planning 99251 Planning $10,000.00
CTC 2018 Acquire Mobile Fare Collection Equipment 106744 Capital $250,000.00
CTC 2019 Capitalized Maintenance 99240 Capital $220,000.00
CTC 2019 2019 Operating Assistance 99242 Operating $707,840.00
CTC 2019 2019 Operating Assistance 99242 Operating $640,820.00
CTC 2019 2019 Security Equipment 99244 Capital $15,000.00
CTC 2019 Transit Enhancements 99246 Capital $15,000.00
CTC 2019 Short Range Planning 99252 Planning $10,000.00
CTC 2020 Capitalized maintenance 104281 Capital $250,000.00
CTC 2020 Operating assistance 104369 Operating $740,840.00
CTC 2020 Security equipment 104377 Capital $15,000.00
CTC 2020 Transit enhancement 104418 Capital $15,000.00
CTC 2020 Short range planning 104425 Planning $10,000.00
CTC 2021 Capitalized Maintenance 104356 Capital $250,000.00
CTC 2021 Operating assistance 104371 Operating $740,840.00
CTC 2021 Security equipment 104378 Capital $15,000.00
CTC 2021 Transit enhancements 104421 Capital $15,000.00
CTC 2021 Short range planning 104429 Planning $10,000.00
Middletown 2018 Operating assistance 94699 Operating $2,400,000.00
Middletown 2018 Capitalized Maintenance 94702 Capital $250,000.00
Middletown 2018 ADA Operating assistance 94703 Capital $175,000.00
Middletown 2019 Operating assistance 94699 Operating $2,400,000.00
Middletown 2019 Capitalized Maintenance 94702 Capital $250,000.00
Middletown 2019 ADA Operating assistance 94703 Capital $175,000.00
Middletown 2020 Operating assistance 104379 Operating $2,400,000.00
Middletown 2020 Preventive maintenance 104381 Capital $250,000.00
Middletown 2020 ADA Operating assistance 104382 Capital $175,000.00
Middletown 2021 Operating assistance 104379 Operating $2,400,000.00
Middletown 2021 Preventive maintenance 104381 Capital $250,000.00
Middletown 2021 ADA Operating assistance 104382 Capital $175,000.00
SORTA 2018 Capital Park & Ride/Transit Centers 90060 Capital $4,350,000.00
SORTA 2018 Preventive Maintenance 94696 Capital $1,282,635.00
SORTA 2018 Preventive Maintenance 94696 Capital $15,561,000.00
SORTA 2018 ADA Service 94698 Capital $1,281,709.00
SORTA 2018 Tire Lease 94700 Capital $736,588.00
SORTA 2018 Security Equipment 94705 Capital $165,000.00
SORTA 2018 2018 Operating Assistance 95141 Operating $29,930,761.00
SORTA 2018 2018 Operating Assistance 95141 Operating $47,583,242.00
SORTA 2018 Bus & Bus Facilities 95697 Capital $965,540.00
SORTA 2018 Bus & Bus Facilities 95697 Capital $492,000.00
SORTA 2018 Bus Replacements 95697 Capital $492,000.00
SORTA 2018 Bus Replacements 95697 Capital $965,540.00
SORTA 2018 Bus Replacements OTPPP 99155 Capital $5,228,509.00
SORTA 2018 Bus replacements-DERG 106797 Capital $1,892,876.00
SORTA 2018 Fare Equipment 106917 Capital $38,000.00
SORTA 2019 Preventive Maintenance 94696 Capital $1,282,635.00
SORTA 2019 Preventive Maintenance 94696 Capital $15,561,000.00
SORTA 2019 ADA Service 94698 Capital $1,281,709.00
SORTA 2019 Tire Lease 94700 Capital $736,588.00
SORTA 2019 Security Equipment 94705 Capital $165,000.00
SORTA 2019 Bus Replacements 95697 Capital $507,000.00
SORTA 2019 Bus & Bus Facilities 95697 Capital $1,197,036.00
SORTA 2019 Bus Replacements 95697 Capital $1,197,036.00
SORTA 2019 Bus & Bus Facilities 95697 Capital $506,400.00
SORTA 2019 Bus Replacements OTPPP 99155 Capital $2,535,000.00
SORTA 2019 2019 Operating Assistance 99225 Operating $47,583,242.00
SORTA 2019 FY 2019 Operating Assistance 99225 Operating $29,930,761.00
SORTA 2019 Bus replacements 99801 Capital $5,880,000.00
SORTA 2020 Bus replacements 103349 Capital $5,900,000.00
SORTA 2020 Preventive maintenance 104411 Capital $15,561,000.00
SORTA 2020 Preventive maintenance 104411 Capital $1,282,635.00
SORTA 2020 ADA Service 104412 Capital $1,281,709.00
SORTA 2020 Tire lease 104413 Capital $165,000.00
SORTA 2020 Tire lease 104413 Capital $736,404.00
SORTA 2020 Bus replacements 104414 Capital $1,478,880.00
SORTA 2020 Bus replacements 104414 Capital $928,000.00
SORTA 2020 Bus replacements 104414 Capital $2,610,000.00
SORTA 2020 Bus replacements - OKI 104648 Capital $5,000,000.00
SORTA 2021 Preventive maintenance 104411 Capital $15,561,000.00
SORTA 2021 Preventive maintenance 104411 Capital $1,282,635.00
SORTA 2021 ADA Service 104412 Capital $1,281,709.00
SORTA 2021 Tire lease 104413 Capital $736,404.00
SORTA 2021 Tire lease 104413 Capital $165,000.00
SORTA 2021 Bus replacements 104415 Capital $1,481,200.00
SORTA 2021 Bus replacements 104415 Capital $2,690,000.00
SORTA 2021 Bus Replacements 107283 Capital $5,260,000.00
TANK 2018 40' Diesel buses 201801 Capital $3,062,500.00
TANK 2018 40' Diesel buses 201801 Capital $550,000.00
TANK 2018 Supervisor vehicle 201805 Capital $150,000.00
TANK 2018 Preventive Maintenance 201811 Capital $1,600,000.00
TANK 2018 Transit enhancements 201812 Capital $57,000.00
TANK 2018 IT Hardware 201814 Capital $20,000.00
TANK 2018 IT Software 201815 Capital $20,000.00
TANK 2018 Security Improvements 201816 Capital $57,000.00
TANK 2018 Renovate Admin. Facility 201818 Capital $150,000.00
TANK 2018 Operating 201820 Operating $16,319,613.00
TANK 2018 Operating 201820 Operating $5,039,120.00
TANK 2018 40' Hybrid Electric buses 201821 Capital $2,619,600.00
TANK 2018 Extend service from Burlington to Florence hub 201822 Operating $72,165.00
TANK 2018 40' Diesel Electric Hybrid Buses 201823 Capital $2,619,800.00
TANK 2019 40' Diesel buses 201901 Capital $2,800,000.00
TANK 2019 40' Diesel buses 201901 Capital $800,000.00
TANK 2019 <30' Diesel buses (Shuttle) 201902 Capital $630,000.00
TANK 2019 <30' Diesel buses (RAMP) 201903 Capital $355,140.00
TANK 2019 Associated Capital Vehicle Equipment 201904 Capital $100,000.00
TANK 2019 Supervisor vehicle 201905 Capital $27,000.00
TANK 2019 Planning Projects 201910 Planning $170,000.00
TANK 2019 Preventive Maintenance 201911 Capital $1,280,130.00
TANK 2019 Transit enhancements 201912 Capital $100,000.00
TANK 2019 Shop Equipment 201913 Capital $30,000.00
TANK 2019 IT Hardware 201914 Capital $50,000.00
TANK 2019 Security Improvements 201916 Capital $50,000.00
TANK 2019 Bldg. and Facility Equipment 201917 Capital $50,000.00
TANK 2019 Renovate Admin. Facility 201918 Capital $50,000.00
TANK 2019 Employee education/training 201919 Capital $20,000.00
TANK 2019 Operating 201920 Operating $17,042,335.00
TANK 2019 Operating 201920 Operating $5,028,108.00
TANK 2020 <30' Diesel buses (Shuttle) 202001 Capital $630,000.00
TANK 2020 40' Diesel buses 202001 Capital $800,000.00
TANK 2020 40' Diesel buses 202001 Capital $2,800,000.00
TANK 2020 <30' Diesel buses (RAMP) 202003 Capital $355,140.00
TANK 2020 Associated Capital Vehicle Equipment 202004 Capital $100,000.00
TANK 2020 Supervisor vehicle 202005 Capital $27,000.00
TANK 2020 Planning Projects 202010 Capital $170,000.00
TANK 2020 Preventive Maintenance 202011 Capital $1,280,130.00
TANK 2020 Transit enhancements 202012 Capital $100,000.00
TANK 2020 Shop equipment 202013 Capital $30,000.00
TANK 2020 IT Hardware 202014 Capital $50,000.00
TANK 2020 Security improvements 202016 Capital $50,000.00
TANK 2020 Bldg. and Facility Equipment 202017 Capital $50,000.00
TANK 2020 Renovate Admin. Facility 202018 Capital $50,000.00
TANK 2020 Employee education/training 202019 Capital $20,000.00
TANK 2020 Operating 202020 Operating $17,042,335.00
TANK 2020 Operating 202020 Operating $5,028,108.00
TANK 2021 40' Diesel buses 202101 Capital $800,000.00
TANK 2021 40' Diesel buses 202101 Capital $2,800,000.00
TANK 2021 <30' Diesel buses (Shuttle) 202102 Capital $630,000.00
TANK 2021 <30' Diesel buses (RAMP) 202103 Capital $355,140.00
TANK 2021 Associated Capital Vehicle Equipment 202104 Capital $100,000.00
TANK 2021 Supervisor vehicle 202105 Capital $27,000.00
TANK 2021 Planning Projects 202110 Planning $170,000.00
TANK 2021 Preventive Maintenance 202111 Capital $1,280,130.00
TANK 2021 Transit enhancements 202112 Capital $100,000.00
TANK 2021 Shop Equipment 202113 Capital $30,000.00
TANK 2021 IT Hardware 202114 Capital $50,000.00
TANK 2021 Security Improvements 202116 Capital $50,000.00
TANK 2021 Bldg. and Facility Equipment 202117 Capital $50,000.00
TANK 2021 Renovate Admin. Facility 202118 Capital $50,000.00
TANK 2021 Employee education/training 202119 Capital $20,000.00
TANK 2021 Operating 202120 Operating $17,042,335.00
TANK 2021 Operating 202120 Operating $5,028,108.00
Warren County Transit System 2018 2018 Operating assistance 99334 Operating $1,027,016.00
Warren County Transit System 2018 Operating assistance 99334 Operating $197,200.00
Warren County Transit System 2018 Buses 99343 Capital $147,915.00
Warren County Transit System 2018 Capitalized maintenance 99343 Capital $124,325.00
Warren County Transit System 2018 2018 Vehicle Replacement 99345 Capital $147,915.00
Warren County Transit System 2019 2019 Operating Assistance 99346 Operating $197,200.00
Warren County Transit System 2019 Operating assistance 99346 Operating $197,200.00
Warren County Transit System 2019 Operating assistance 99346 Operating $1,028,016.00
Warren County Transit System 2019 2019 Operating Assistance 99346 Operating $1,062,713.00
Warren County Transit System 2019 Capitalized maintenance 99347 Capital $124,325.00
Warren County Transit System 2019 Bus replacements 99347 Capital $147,915.00
Warren County Transit System 2019 2019 Capitalized Maintenance 99347 Capital $128,094.00
Warren County Transit System 2019 2019 Vehicle Replacement 99348 Capital $203,136.00
Warren County Transit System 2020 Operating assistance 104483 Operating $197,200.00
Warren County Transit System 2020 Operating assistance 104483 Operating $1,027,016.00
Warren County Transit System 2020 Capitalized maintenance 104483 Capital $124,325.00
Warren County Transit System 2020 Bus replacements 104483 Capital $147,915.00
Warren County Transit System 2021 Bus replacements 104483 Capital $147,915.00
Warren County Transit System 2021 Capitalized maintenance 104485 Capital $124,325.00
Warren County Transit System 2021 Operating assistance 104485 Operating $1,027,016.00
Warren County Transit System 2021 Operating assistance 104485 Operating $197,200.00
Transit System Name State FY Project Description PID Type Total Project Cost $